© 2018 Littoral Power Systems Inc.

 

  • c-facebook
  • Twitter Classic
  • Google Classic
Please reload

Follow Us

April 2, 2016

 

The New England grid has a nameplate capacity of about 31 gigawatts (GW).  That's 31,000 megawatts.  About 15% of this is from facilities slated to go offline by the end of next year.  There is a mad dash to replace this missing capacity.  It is a big deal because nor...

Please reload

  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

February 8, 2019

June 15, 2017

June 13, 2017

January 26, 2017

August 15, 2016

Please reload

Recent Posts
Search By Tags
Featured Posts

Semi-into the drink

March 15, 2015

1/1
Please reload

Archive