© 2018 Littoral Power Systems Inc.

 

  • c-facebook
  • Twitter Classic
  • Google Classic

February 8, 2019

June 15, 2017

June 13, 2017

Please reload

Recent Posts

Tests of Full-Sized Modular Dam Componentry

January 22, 2018

 

LPS has begun testing of various full-sized components of its innovative modular dam systems.  The tests are being conducted at Alden Research Laboratory with design input and guidance from GZA GeoEnvironmental.  Components to be tested include rack frame members, connectors, seals and other ancillary components.

 

These tests will continue throughout the first half of 2018 and will lead to the selection of optimal component designs for assembly into full sized modules to be transported, assembled and tested at a pilot facility in MA and LPS's first utility-scale installation in VA.

 

 

 

 

Please reload

Please reload

Archive